Thursday 20 June 2013

My List

Because all of this waiting is driving me insane. I have made a list of things I think need to be done before we finish. Although considering I have pretty much zero knowledge of building I am probably missing quite a few things. So the list goes:
1. Bathroom shower screen (yes they only delivered one)
2. Window pieces (We have a bay window at the front that needs to have in between pieces put in)
3. Water Tank
4. BBQ (We have been warned this might be handed to us at handover as they frequently go missing on building sites)
5. Microwave (Same as BBQ)
6. Splashback
7. Power points in splashback
8. Tiling (being done right now)
9. Carpet
10. Flyscreens
11. Driveway
12. Steps in garage
13. Servery benchtop (We have one at the moment but it is horrible. It has been cut way too small and doesn't properly cover what it is sitting on. We are also wondering what is being put under the benchtop to hide the join. It looks really bad atm.)
14. TV points (We are getting these done ourselves. The holes have been cut, the boys just need to come back out and cover them. I would like this done before the bank does their valuation but hubby thinks it is fine. *insert eyeroll*)

So in the grand scheme of things the list isn't massive but it gives me something to cross off. We had a very dispointing moment on Wednesday when we went to the house expecting to see tiles and finding that no-one had been there at all. Thankfully there were some tiles down yesterday. Hopefully this doesn't put us behind. As always we seem to go through a busy week and a quiet week. This week has been rather quiet, which is pretty annoying when we are so close to the end. All that has happened is the outdoor cupboard was installed, a little bit of light cleaning and some tiles. Seems really unproductive compared to last week. I guess that is just part of the joys of building.